发布信息当前位置: 首页 » 工程项目需求 » 其他 »

尼日利亚水处理项目

点击图片查看原图
有效期至: 2017-04-03 [已过期]
最后更新: 2017-03-22 10:29
浏览次数: 244
公司基本资料信息
您还没有登录,请登录后查看联系方式
免费注册为会员后,您可以...
发布供求信息 推广企业产品
建立企业商铺 在线洽谈生意
还不是会员,立即免费注册
 
 
详细说明

尼日利亚水处理项目

Project ID: P124905
Borrower/Bid No: KNSPMU/CQBS/20/1.1



FEDERAL REPUBLIC OF NIGERIA

KANO STATE GOVERNMENT

MINISTRY OF ENVIRONMENT

Kano State Nigeria Erosion & Watershed Management Project (KN-NEWMAP)

No 229, Old WRECA Office Kofar Kansakali, behind Goron Dutse Hill, Kano

Project ID: 124905

Contract Ref. No. KNSPMU/CQBS/20/1.1

 

REQUEST FOR EXPRESSION OF INTEREST (EOI) FOR THE ENGINEERING DESIGN AND SUPERVISION WORKS OF FIVE (5) EROSION CONTROL SITES AND SUPERVISION OF FOUR (4) WATER CONSERVATION STRUCTURES WITH MINOR IRRIGATION FACILITIES IN KANO STATE.

 

As part of Governments commitment to transformation of the Nigerian socio-economy landscape, a multi-sector project is being executed in Nigeria to mitigate the vulnerability to erosion and support the people as they relate to their land. The Nigeria Erosion and Watershed Management Project (NEWMAP) is an 8-year multi- sectoral and multi-scale program that targets States with acute gully erosion. The project is involving many Federal and State Ministries, Departments and Agencies (MDAs), Local Governments Communities and Civil Societies who are responsible for Planning, economy, finance, works, agriculture, water resources, forest, transport, power, emergency response as well as those focused on climate and hydrological information or watershed/basin regulation. In order to achieve this, the Federal Government of Nigeria (FGN) has received a credit of US$500 million from the International Development Association (IDA) for the implementation of Nigeria Erosion and Watershed Management Project.

 

Kano State which is participating in the implementation of the project and  intends to use part of the proceeds of the credit for Engineering Design and Supervision Works for five (5)  erosion control sites and four (4) water conservation structures and minor irrigation facilities in various locations in the state.

 

OBJECTIVE 

Kano state Nigeria erosion and Watershed Management Project (KN-NEWMAP), the implementing agency in the state has the responsibility of providing a "Damage Control" to slow the expansion of targeted set of aggressive gullies across the state, thereby reducing the loss to property and infrastructure and helping cultivate community ownership; influencing the gully intervention to support integrated watershed management and move towards greater adoption of sustainable land and watershed management practices by the local people in the sub-watershed where the gullies are located.

Therefore, the purpose of this consultancy services is to select a qualified Firm who will be required to carry out Engineering Design and Supervision of Works at the identified five (5) erosion sites and four (4) water conservation structures and minor irrigation facilities across the State which are recognized as threat to the safety of lives and property.

The consultancy Firm will be hired for an initial period of two years to provide services under the following two phases.

 

PHASE 1; DETAILED ENGINEERING DESINGS

When a site is identified by the project, the consultant will be responsible for preparing the detailed engineering designs including consultation and planning for an integrated watershed planning and management ; involving topography surveying, geotechnical investigation, hydrological, hydraulic, geotechnical (incl. survey of construction materials) and structural engineering analysis, cost estimates and bill of quantity (BOQ) excluding bidding documents for the identified five (5) erosion control intervention sites and four (4) water conservation structures and minor irrigation facilities. The contract agreement to be signed for the first phase shall be a lump sum Contract.

 

PHASE II; SUPERVISION OF CONSTRUCTION WORKS

When a bidding process has been successfully concluded and a contract signed, the consultant will supervise the construction works at the site to the satisfaction of the client, and which will arise from the detailed design of activities to be undertaken. To ensure that high quality construction with detailed supervision is achieved and to ensure that all associated works are carried out in full compliance with the engineering design, working drawings, bill of quantities, technical specifications and other contract documents. The contract agreement to be signed for the first phase shall be a timed Based contract.

Although the design and supervision consultant will be procured through the World Bank QCBS method less than one selection process, the supervision is not automatic but largely dependent on the satisfactory performance of the consultant at the design stage. The consultants would be required to submit technical and financial proposals separately for phase I and phase II. The evaluation process would be carried out based on the proposals submitted for phase I and II together, but the contract would be awarded only for phase I and may be extended for phase II under the condition that the performance under phase I is satisfactory.

 

For sites whose designs have been completed, the consultant will be required to provide Engineering Supervision of the works after contract signature. The satisfactory performance of the consultant at each stage of the supervision will determine the continuation of the assignment.

 

SUBMISSION OF EXPRESSION OF INTERESTS (EOIs)

The Kano State Nigeria Erosion and Watershed Management Project (KN- NEWMAP) now invites eligible consulting firms ("Consultants") to indicate their interest in providing the services. Interested Consultants should provide information demonstrating that they have the required qualification and relevant experience to perform the services.

The short listing criteria are (i) evidence showing the fields of specialty of the firm (consultant's profile/brochures) (ii) evidence showing that the firm is a legal entity (certificate of registration), (iii) evidence of registration with relevant authorities and professional bodies, (iv) evidence showing the technical and managerial capabilities of the firm in the field of assignment, (v) experience of working in a similar geographical region, (vi) description of similar assignments, (vii) availability of appropriate skills among staff and availability of essential technology etc. for each  previous project performed, the consultant shall provide the name and address of the client (office & e-mail address and phone number ), date(s)of execution, name(s) of lead and associate firms contract amount and financing sources.

The attention of interested Consultant (firm) is drawn to paragraph 1.9 of the World Bank's Guidelines: Selection and Employment of Consultants [under IBRD loans and IDA Credit and & Grants] by the World Bank Borrowers [January 2011] ("Consultant Guidelines") Please visit www.worldbank.org, setting forth the World Bank's policy on conflict of interest. In addition, please refer to the following specific information on conflict of interest related to this assignment on conflict of interest related to the assignment as per paragraph 1.9 of the Consultant Guidelines.

 

Consultant may associate with the other firms in the form of joint ventures or a sub-consultancy to enhance their qualifications.

A Consultant will be selected in accordance with the Quality and Cost Based Selection method (QCBS) set out in the Consultant Guidelines.

 

Further information can be obtained at the address below during office hours (10:00 to 16:00)

 

Expression of interest must be delivered in written form to the address below (in person, or by mail, or e-mail) not later than 5.00 pm on April 3, 2017

 

Attn: Musa Shuaibu- State Project Coordinator

C/O PROCUREMENT OFFICER.

Kano State Nigeria Erosion and Watershed Management Project (KN-NEWMAP)

No 229, Old WRECA Office Kofar Kansakali, behind Goron  Dutse Hill, Kano

Tel: 08065075376, 09095123607, 08023301875

E-mail:kanonewmap@gmail.com,   shuaibumusa28@gmail.com


 
更多»同类工程项目需求

[ 工程项目需求搜索 ]  [ 加入收藏 ]  [ 告诉好友 ]  [ 打印本文 ]  [ 关闭窗口 ]

 
 
友情链接


 
网站首页 | 中国方舟小课堂 | 服务条款 | 联系我们 | 网站地图 | 网站留言 | RSS订阅 | 辽ICP备14005039号-5 | 增值电信业务经营许可证: 辽B2-20150174| 公司营业执照
远离传销,珍爱幸福
禁止传销是全社会的共同责任
深入开展“无传销网络平台”创建活动
拒绝传销,从我做起;举报传销,人人有责
认清传销危害,切勿上当受骗
传销骗人是陷阱,天上不会掉馅饼